Upgrade Your Property with Zero-Capital EV Infrastructure.
Transform your parking lot into a revenue-generating energy hub. We deploy Battery-Integrated Fast Charging stations with no cost to you, bypassing expensive grid upgrades.

Power Output
2 × 160 kW DC
Storage Buffer
233 kWh LFP
Deployment
≈ 3 Months
Visual rendered from public/assets/hero.png. Replace the file to update the hero.
Market Context
The Canadian EV Infrastructure Gap
Canada’s mandate is clear: 100% EV sales by 2035. The demand is surging, but the infrastructure is lagging behind. Properties that act now will secure the best locations on the grid.
Our Solution & Technical Specs
Bypassing the Grid Constraint
Traditional DC fast charging requires massive grid upgrades, taking years to approve and build. Canevera utilizes Battery Energy Storage Systems (BESS) to deliver high power using existing low-power grid connections.
The Traditional Way (Pain)
- High voltage transformers required
- 18–36 months for utility upgrades
- High demand charges and OpEx exposure
The Canevera Way (Gain)
- Connects to existing commercial power
- ≈ 3 months deployment timeline
- Peak shaving reduces grid stress and fees
System Configuration: PositEdge BESS + DCFC
Industrial-grade hardware designed for Canadian climates
Energy Storage Unit (BESS)
- •233 kWh liquid-cooled LFP battery
- •Peak shaving, grid buffering, emergency backup capable
- •Multi-level fire suppression and safety monitoring
Charging Terminals (EVSE)
- •2 × 160 kW DC Fast Chargers (CCS1/NACS)
- •15-inch touch screen with POS integration
- •>95% power conversion efficiency
Grid Requirements
- •Compatible with standard 480V/600V commercial feeds
- •Minimal amperage draw thanks to buffered storage
- •No costly utility-side upgrades required


Business Model
Energy-as-a-Service (EaaS)
A fully managed partnership model. We take on the risk; you share the reward.
Value for Hosts
Target Locations
Ideal For High-Traffic Commercial Properties
If you have consistent vehicle flow and existing commercial power, we can run a rapid deployment assessment.
Retail & Grocery
Turn weekly shopping trips into charging opportunities.
Hotels & Hospitality
Premium amenity for guests and travelers.
Gas Stations & Convenience
Transition your fuel business to the electric era.
Community Hubs
Libraries, municipal centers, and religious institutions.
Deployment Process
From Agreement to Activation
A predictable, end-to-end delivery framework that keeps your operations running while we build the charging infrastructure.
Site Assessment (Week 1)
Step 1We analyze electrical capacity, traffic patterns, and site logistics.
Proposal & Agreement
Step 2Transparent revenue-share contract with defined SLAs.
Permitting & Design (Weeks 2-8)
Step 3We handle municipal approvals, utility coordination, and stamped drawings.
Installation (Weeks 9-11)
Step 4Prefabricated equipment allows rapid on-site assembly—~1 week construction.
Commissioning (Week 12)
Step 5System testing, interconnection checks, and go-live.
Smart Management
Transparent Operations
Unified software for hosts and drivers: operational visibility, automated payouts, and a frictionless charging experience.
Real-time dashboard to track energy usage, carbon offset, and financial earnings. Automated monthly payouts.
Seamless mobile app for station locating, payment processing, and charging status updates.
Integrated POS, invoicing, and uptime reporting to keep revenue share auditable and predictable.


Ready to Electrify Your Property?
Get a Free Site Proposal
Find out if your site qualifies for a free Canevera installation. We respond with a clear deployment and revenue plan.